Wacker Neuson PDI 3 Manuel de l'opérateur

Naviguer en ligne ou télécharger Manuel de l'opérateur pour Non Wacker Neuson PDI 3. Wacker Neuson PDI 3 Operator`s manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - OPERATOR’S MANUAL

PumpPDT 2APDI 2APDT 3APDI 3AOPERATOR’S MANUAL0154614en 00603090154614EN

Page 2

Safety Information PD 2A/3Awc_si000085gb.fm 102.5 Label LocationsDO NOT OPERATE WITHOUT SAFETY GUARDS. READ AND UNDERSTAND INSTRUCTION BOOK.NICHT OHNE

Page 3 - PD 2A/3A Table of Contents

PD 2A/3A Safety Informationwc_si000085gb.fm 112.6 Safety LabelsWacker machines use international pictorial labels where needed.These labels are descri

Page 4 - Table of Contents PD 2A/3A

Safety Information PD 2A/3Awc_si000085gb.fm 12CAUTION! Lifting point.Guaranteed sound power level in dB(A).Label Meaning

Page 5 - Foreword

PD 2A/3A Technical Datawc_td000085gb.fm 133. Technical Data3.1 EngineItem Number:PDT/PDI 2A0007610, 00076110007624, 0007625PDT/PDI 3A0007614, 0007615,

Page 6

Technical Data PD 2A/3Awc_td000085gb.fm 143.2 PumpItem Number:PDT/PDI 2A0007610, 00076110007624, 0007625PDT/PDI 3A0007614, 0007615, 0007616, 0007628,

Page 7

PD 2A/3A Technical Datawc_td000085gb.fm 153.3 Sound MeasurementsThe required sound specification, Paragraph 1.7.4.f of 89/392/EECMachinery Directive,

Page 8

Technical Data PD 2A/3Awc_td000085gb.fm 163.4 DimensionsItem RevisionAmm (in.)Bmm (in.)Cmm (in.)Xmm (in.)Ymm (in.)Zmm (in.)0007610PDT2A107- 635(25)101

Page 9

PD 2A/3A Technical Datawc_td000085gb.fm 170007614PDT3A107- 750(29.5)1015(40)610(24)---108+ 760(30)1015(40)635(25)---0007615PDT3A(I)750(29.5)1015(40)61

Page 10 - Safety Information PD 2A/3A

Operation PD 2A/3Awc_tx000228gb.fm 184. Operation4.1 ApplicationThis pump is intended for removing clean water or water containing alarge amount of de

Page 11 - PD 2A/3A Safety Information

PD 2A/3A Operationwc_tx000228gb.fm 194.3 Transporting the Machine Fire hazard. Spilled fuel can ignite and cause severe burns. Lift andtransport the m

Page 13 - PD 2A/3A Technical Data

Operation PD 2A/3Awc_tx000228gb.fm 204.4 Priming PumpSee Graphic: wc_gr001064Diaphragm pumps are self priming and seldom need to have wateradded to t

Page 14 - Technical Data PD 2A/3A

PD 2A/3A Operationwc_tx000228gb.fm 214.6 To StartSee Graphic: wc_gr0000144.6.1 Open fuel valve by moving lever to the right (a1).Note: If engine is c

Page 15

Operation PD 2A/3Awc_tx000228gb.fm 224.8 OperationRun engine at full speed while operating pump.Pump should begin pumping water within a minute depend

Page 16

PD 2A/3A Operationwc_tx000228gb.fm 234.10 Hoses and ClampsSee Graphic: wc_gr001065Suction HoseSuction hoses (a) must be rigid enough not to collapse w

Page 17

Maintenance PD 2A/3Awc_tx000229gb.fm 245. Maintenance5.1 Periodic Maintenance ScheduleThe chart below lists basic machine and engine maintenance. Refe

Page 18 - Operation PD 2A/3A

PD 2A/3A Maintenancewc_tx000229gb.fm 255.2 Changing Engine OilSee Graphic: wc_gr0000225.2.1 Drain the oil while the engine is still warm.5.2.2 Remove

Page 19 - PD 2A/3A Operation

Maintenance PD 2A/3Awc_tx000229gb.fm 265.3 Servicing Air CleanerSee Graphic: wc_gr000025The engine is equipped with a dual element air cleaner. Servic

Page 20

PD 2A/3A Maintenancewc_tx000229gb.fm 275.4 Spark PlugSee Graphic: wc_gr000028Clean or replace the spark plug as needed to ensure proper operation.Refe

Page 21

Maintenance PD 2A/3Awc_tx000229gb.fm 285.5 Gear CaseSee Graphic: wc_gr003450Check the oil level in the gear case once a week or every 25 hours ofopera

Page 22

PD 2A/3A Maintenancewc_tx000229gb.fm 295.6 Connecting Rod BearingSee Graphic: wc_gr003451Grease connecting rod bearing once a week or every 25 hours o

Page 23

PD 2A/3A Table of Contentswc_bo0154614006enTOC.fm 31. Foreword 52. Safety Information 62.1 Laws Pertaining to Spark Arresters ...

Page 24 - Maintenance PD 2A/3A

Maintenance PD 2A/3Awc_tx000229gb.fm 305.8 Cleaning Sediment CupSee Graphic: wc_gr0000295.8.1 Turn the fuel valve off. 5.8.2 Remove the sediment cup (

Page 25 - PD 2A/3A Maintenance

PD 2A/3A Maintenancewc_tx000229gb.fm 315.10 StorageIf pump is being stored for more than 30 days: NEVER open priming plug, discharge plug, or cover wh

Page 26

Maintenance PD 2A/3Awc_tx000229gb.fm 325.11 TroubleshootingProblem / Symptom Reason / RemedyEngine does not start. • Engine problem. See engine manufa

Page 27

PD 2A/3A Maintenancewc_tx000229gb.fm 335.12 Decomissioning5.12.1 When this machine has reached the end of its useful life, practiceenvironment-friendl

Page 34

Table of Contents PD 2A/3Awc_bo0154614006enTOC.fm 45.4 Spark Plug ...

Page 42

2008-CE-PD2_PD3_Q.fmWilliam Lahner Dan DomanskiVice President of Engineering

Page 43

Wacker Construction Equipment AG · Preußenstraße 41 · D-80809 München · Tel.: +49-(0)89-3 54 02 - 0 · Fax:

Page 44

Forewordwc_tx000001gb.fm 5CALIFORNIAProposition 65 Warning: Engine exhaust, some of its constituents, and certain vehiclecomponents, contain or emit

Page 45

Safety Information PD 2A/3Awc_si000085gb.fm 62. Safety InformationThis manual contains DANGER, WARNING, CAUTION, NOTICE andNOTE callouts which must be

Page 46

PD 2A/3A Safety Informationwc_si000085gb.fm 7In order to comply with local laws regarding spark arresters, consultthe engine distributor or the local

Page 47 - 30.07.08

Safety Information PD 2A/3Awc_si000085gb.fm 82.2 Operating SafetyInternal combustion engines present special hazards during operationand fueling. Read

Page 48

PD 2A/3A Safety Informationwc_si000085gb.fm 92.3 Operator Safety while using Internal Combustion EnginesA poorly maintained machine can become a safet

Commentaires sur ces manuels

Pas de commentaire