Wacker Neuson G 70 Manuel de l'opérateur Page 38

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 86
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 37
wc_tx003552gb_FM10.fm
38
Rammer
Operation
4 Operation
4.1 Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed, including fuel, engine oil, and ramming system oil.
6. On rammers with oil injection (BS 50-2i, BS 60-2i, BS 70-2i), visually check the
oil in the oil supply line for air bubbles. If air bubbles exist, purge the oil supply
line before operating the machine. See topic Purging the Oil Lines for detailed
instructions.
7. Move the machine to its operating location.
Vue de la page 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 85 86

Commentaires sur ces manuels

Pas de commentaire