Wacker Neuson EHB 10 series Manuel de l'opérateur Page 27

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 60
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 26
EHB 11 Operation
27
7Operation
7.1 Prior to starting the machine
After unpacking, the machine is ready for operation.
Checking the machine
f Check the machine and all components for damages.
Checking the mains
f Check if mains or power distribution on the construction site have the correct
operating voltage (see nameplate of the machine or chapter Technical Data).
f Check if mains or power distribution on the constructions site are protected
in accordance with current standards and regulations.
WARNING
Improper handling can result in injury or serious material damage.
f Read and follow all safety instructions of this operator's manual, see chapter
Safety.
Vue de la page 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 59 60

Commentaires sur ces manuels

Pas de commentaire