Cub 200/300/300 HD Operation
wcghi_tx000720gb.fm 15
3 Operation
3.1 System Description
The Cub series Air Heater machines are indirect-fired air heaters. The
Cub series Air Heater machines incorporate aluminized steel shells
and heat exchangers. The machines run on three fuel options: diesel,
Kerosene, or winter blend diesel (winter blend diesel is treated with
anti-gelling conditioners for use in cold weather). The fuel is consumed
in a closed combustion chamber. The exhaust gasses must be vented
outdoors through a vent pipe. The clean, dry hot air is recirculated by
means of an enclosed blower.
The Cub series Air Heater machines are intended to heat air on
construction sites and in other rugged environments. Do not use the
machines for any other purpose.
3.2 Installing the Lift Brackets
See graphic ghi_gr005931
Before attempting to lift the Cub 200 and 300 models, the lift brackets
must be installed.
3.2.1 Remove the machine from the crate.
3.2.2 Intstall the four lift brackets (a) as shown using the supplied bolts and
washers.