Wacker Neuson BTS 635s Manuel de l'opérateur Page 39

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 80
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 38
BTS 630, 635 8 Initial start up
Operator's manual 39
Mounting the cutting attachment on the outside
1. Remove the cutting attachment.
2. Clean the cutting attachment, V-belt pulley, belt guard and screws.
3. Rotate the cutting attachment 180° and place it in position.
4. Place the V-belt in position.
5. Place the belt guard in position and affix it with screws.
6. Rotate the adjusting screw clockwise until the square nut is located between
the two marks.
7. Tighten the belt guard screws.
Torque 25 Nm.
8. Position the hose connections and tighten them.
Item Designation Item Designation
1 Hose connection (2 pieces) 3 Adjusting screw
2 Belt guard 4 Screw (2 pieces)
Vue de la page 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 79 80

Commentaires sur ces manuels

Pas de commentaire