Operation G 25
40 wc_tx001045gb.fm
4.10 Grounding the Generator
Location
A ground connection is located at the customer connection terminal
lugs.
Function
This ground connection is used for electrically grounding the
generator when necessary to comply with the National Electrical
Code and other federal, state, and local regulations. For grounding
requirements in your area, consult with a qualified electrician,
electrical inspector, or local agency having jurisdiction over electrical
compliance.
If the generator is used at a construction site, there may be
additional regulations which must be observed.
In some areas, generators are required to be registered with local
utility companies.
wc_gr008288
Vue de la page 39